ELLSWORTH — The Ellsworth Village Board tabled a proposed floodplain study in the East End Industrial Park, with board trustees citing too broad of a cost estimate and a lack of information. …
This item is available in full to subscribers.
To continue reading, you will need to either log in, using the login form, below, or purchase a new subscription.
If you are a current print subscriber, you can set up a free website account and connect your subscription to it by clicking here.
Otherwise, click here to view your options for subscribing.
Please log in to continue |
ELLSWORTH — The Ellsworth Village Board tabled a proposed floodplain study in the East End Industrial Park, with board trustees citing too broad of a cost estimate and a lack of information. The item is expected to return at the next meeting.
The Village owns 17 acres of land in the East End Industrial Park off of County Road C, much of which is in a designated floodplain.
“This is an unstudied area of the floodplain, so basically, it is all considered non-developable,” Village Administrator/Clerk-Treasurer Brad Roy said. “It could decrease the size of the floodplain, it could also increase the size of the floodplain, we don’t know that.”
Roy said no development can be added when the floodplain is unstudied; however, portions of the land can be found as fringe floodplain in the study, meaning with certain steps the land can be developed. Roy said he is “very confident” some of the land would be designated flood fringe that currently cannot be used.
He also mentioned two businesses have already shown interest in the land, but talks stalled out due to the floodplain hurdle.
Roy said the Village Engineer gave a rough estimate of $5,000-15,000 for the study plus another $5,000 to submit to FEMA. Roy said to be safe, he would ask the board to authorize $20,000 if they wanted to go through with things, and two acres of additional land sold would break them even.
“If we do this study and we find out that, yep, this area that’s defined as the floodplain, can’t build on it, are developers still going to want to purchase that property knowing that it is a floodplain,” Trustee Ryan Bench said.
Trustees Tony Hines and Andrew Borner asked that the item be tabled for a month to get a closer cost estimate and further information on the study and what information the village would receive upon its completion. The motion to table was unanimously approved.
Kwik Trip
As part of the consent agenda, the board approved a CSM and Site Plan for the proposed Kwik Trip. The 11,033 square-foot building will be off of Highway 65 at the corner West Overlook Drive and Lucas Lane.
Other business