RIVER FALLS / PRESCOTT — ….

Posted 5/4/21

RIVER FALLS / PRESCOTT — Construction on Highway 29 from Prescott to River Falls will start May 10. The project includes replacing the pavement, rehabilitating Greenwood Valley Creek Bridge, …

This item is available in full to subscribers.

Please log in to continue

Log in

RIVER FALLS / PRESCOTT — ….

Posted

RIVER FALLS / PRESCOTT — Construction on Highway 29 from Prescott to River Falls will start May 10.

The project includes replacing the pavement, rehabilitating Greenwood Valley Creek Bridge, improving various intersections and installing rumble strips.

Monarch Paving Co. of Amery is the prime contractor. During construction, Highway 29 will remain open between U.S. Highway 10 and County Road F until mid-July, but starting Monday, Highway 29 will be closed to through-traffic from County F to Cemetery Road.

The project

From Highway 10 to the County Road QQ south junction:

•Removing and replacing existing pavement.

•Removing and replacing culvert pipes at multiple locations.

•Removing and replacing existing guardrail.

From County Road QQ south junction to Cemetery Road in River Falls:

•Removing and replacing existing pavement.

•Replacing culverts, guardrail and 3foot paved shoulders with 5-foot paved shoulders.

•Installing centerline and edge line rumble strips. That also means installing guardrail and advanced warning signs at spot locations.

•Rehabilitating the bridge over Greenwood Valley Creek.

•Modifying three intersections:

•County Road E — changing the bypass lane to a dedicated left-turn lane;

•County Road FF — rebuilding the intersection to add left-turn lanes for eastbound and westbound Highway 29 traffic and a right-turn lane for westbound Highway 29 traffic, plus reconfiguring the channelizing island for right turns from southbound County Road FF;

•Cemetery Road — widening the southeast radius for truck movement.

Access will be maintained for properties located along the length of each project, but temporary driveway closures will be necessary during parts of the construction process. WisDOT will contact homeowners and businesses in advance before temporarily closing any driveway.

At least one 12-foot wide gravel surface will be provided for local traffic.

Pedestrians will be detoured during box culvert work near 805th Avenue in River Falls.

Construction is scheduled for completion in late September. The schedule is dependent on favorable weather conditions and construction progress.

Follow the process

For more information regarding traffic impacts, transportation news and improvement project updates in Wisconsin’s Northwest Region:

•Follow us on Twitter: @WisDOTnorthwest •Visit the region’s 511 website: projects. 511wi.gov/region/northwest/

•Visit the project’s 511 website: projects. 511wi.gov/wis29pierce/ Motorists are reminded that using handheld cell phones in Wisconsin work zones is illegal. Alerts and updates provided via these sites are not intended for use while driving. When driving, your focus should always be on driving.

Submitted by WisDOT